Weiermatten Plus-Energy Climate Houses
83
Apartments
4
Houses
4
Retail Stores
01OurServices
Construction carried out by the MKE Group.
- Time period
- 2020 to 2021
- Architecture
- Rolf Disch SolarArchitektur, Freiburg
Construction work was performed by the MKE Group. Project development, planning, and investment were handled by third parties.
02Gallery
Views.
03Overview
In the new town center of Schallstadt, a row of buildings approximately 115 meters long has been constructed to the plus-energy standard.
Solar panels on roofs and balcony railings, along with waste heat from a sewer, supply the buildings with energy.
04Profile
The facts at a glance.
- Location
- Brandhof, 79227 Schallstadt
- Apartments
- Accessible, 25 to 170 m², penthouses with rooftop terraces
- Standard
- KfW Efficiency House 40 Plus
- Award
- German Solar Prize
Next Project · Freiburg im Breisgau
Residential Building in Freiburg