Neufreimann MU 1(9)
← All ProjectsMunichNeufreimann

Neufreimann MU 1(9)

Under DevelopmentHenny-Seidemann-Straße / Frederike-Nandig-Allee, 80939 Munich
144
Residential Units
approx.8,280m²
Living space
80years
Rent Control
KfW 40
Energy Standard with QNG
Competition Design Proposal
01Overview

In Munich’s new Neufreimann neighborhood, MKE is developing 144 affordable rental apartments on construction lot MU 1(9), with commercial space on the ground floor and first floor—designed according to a continuous grid that stacks underground parking, commercial space, and residential units on top of one another.

On the site of the former Bayernkaserne, Neufreimann is taking shape as one of Germany’s largest urban development projects: 5,500 apartments for up to 15,000 people are being built on approximately 60 hectares. On the MU 1(9) construction site on Henny-Seidemann-Straße, MKE is carrying out a second project in the neighborhood alongside MU 1(8) West.

The project calls for 144 rent-controlled apartments with a total living area of approximately 8,280 m². Seventy-five percent of the apartments are reserved for specific target groups, such as workers in high-demand occupations and seniors. All apartments are accessible. On the ground floor and first floor, commercial spaces complement the residential units, along with a common room and an underground parking garage.

The design consists of a tower with up to eleven stories and a lower section of the building surrounding a landscaped courtyard. The structural framework follows a uniform 4-meter grid, with underground parking, commercial spaces, and apartments stacked one above the other, and the standard floors repeating in a regular pattern. This simplifies planning and construction. Red clinker brick facades with wooden accents, rooftop gardens, the public “Grüne Gasse,” and communal areas define the building’s character.

MKE is an investor, developer, and project developer. Construction is scheduled to begin in 2027, with completion planned for 2029.

03Profile

The facts at a glance.

Location
Construction Site MU 1(9), Henny-Seidemann-Straße / Frederike-Nandig-Allee, 80939 Munich
Neighborhood
Neufreimann, former site of the Bayernkaserne (Schwabing-Freimann district)
Usage
Affordable rental housing with commercial space on the ground floor and first floor, a common area, and an underground parking garage
Residential Units
144 Competition Design Proposal
Living space
Approx. 8,280m² Competition Site Plan
BGF
Approx. 15,700 m² gross floor area, of which approx. 10,500 m² is residential and approx. 2,400 m²is commercial. Competition Proposal
Property
approx. 4,370 m²
Target Audience
75% of the apartments are reserved for specific target groups, such as workers in high-demand occupations and seniors
Rent Control
80 years
Accessibility
All apartments are accessible
Energy
KfW Efficiency House 40 with QNG sustainability certification, district heating, photovoltaic system, green roofs
Role of MKE
Investor, Building Owner, and Project Developer
Start of Construction
planned for 2027
Completion
expected in 2029
04Architecture

One zoning category for everything: garages, commercial, residential.

  • 01
    Building structure: A towerwith up to eleven stories and a lower section surrounding a landscaped courtyard; underground parking garage in the basement
  • 02
    Structural System: Uniform4-meter grid: Parking spaces, commercial units, and residential units are stacked one above the other, with the standard floors repeating (competition design)
  • 03
    Facade: Redclinker brick with profiled surfaces, wood accents on loggias and commercial areas, light-colored base made of concrete slabs
  • 04
    Open Space: Landscapedcourtyard, rooftop gardens with urban gardening, public green alley, gathering places, and play areas
  • 05
    Accessibility: Allapartments are accessible
KfW 40Energy-Efficient Home
QNGSustainability Certification
District Heatingplus a photovoltaic system
MapClick to enlarge
Layout and Use by FloorClick to enlarge
Longitudinal sectionClick to enlarge
Cross-sectionClick to enlarge
Facade SectionClick to enlarge
05Open Spaceand Climate

Green at every level.

The courtyard, rooftop gardens, terraces, and the public “Grüne Gasse” together form the open space of the development site. Green roofs retain rainwater, while depressions in the courtyard and along the “Grüne Gasse” collect it; the plants provide cooling and create habitats for insects and birds. The illustrations show the concept from the competition.

Open Space Concept: Roof Areas, Terraces, Courtyard, and Green Alley
Sustainability Strategy: Climate Resilience, Environmental Protection, and Energy
06Neighborhood

Part of a new urban neighborhood.

The MU 1(9) construction site is located along the Magistrale in the southern part of Neufreimann, where the new neighborhood borders the Euro-Industriepark.

Neufreimann Neighborhood Model with Construction Site MU 1(9)
07Location

In northern Munich, on the grounds of the Bayernkaserne.

The construction site is located at the corner of Henny-Seidemann-Straße and Frederike-Nandig-Allee in the new Neufreimann neighborhood in northern Munich, on the site of the former Bayernkaserne in the Schwabing-Freimann district. Neufreimann is one of the largest urban development projects in Germany.

~60 haNeufreimann Urban District
5,500Apartments are being built in the neighborhood
up to 15,000People are expected to live in the neighborhood
08Environment

A new neighborhood with everything you need.

A supermarket, pharmacy, high school, and bus stop are about four minutes away, and the Freimann subway station is about a 20-minute walk: The map shows what’s within easy reach of the construction site. A marker on the map or an entry in the list indicates what’s located there.

Map is loading
  1. Kaufland
    Shopping
    3 MIN
  2. Neufreimann High School
    School
    3 MIN
  3. Domos Pharmacy
    Health
    4 MIN
  4. Neufreimann Bus Stop
    Bus
    4 MIN
  5. Munich VI Public Secondary School
    School
    12 MIN
  6. St. George’s School Munich
    School
    14 MIN
  7. Edeka
    Shopping
    14 MIN
  8. Nahkauf
    Shopping
    15 MIN
  9. Caritas St. Katharina Preschool
    Daycare
    15 MIN
  10. Children's Home at Werner-Egk-Bogen 33
    Daycare
    16 MIN
  11. Keilberth School
    School
    16 MIN
  12. Keilberthstraße 12 Daycare Center
    Daycare
    17 MIN
  13. Schwabing Nord Stop
    Tram
    19 MIN
  14. Freimann Subway Station
    Subway
    20 MIN
  15. Domagk Park
    Green
    20 MIN
  16. Kieferngarten Subway Station
    Subway
    22 MIN
Walking times estimated as the crow flies · Locations: © OpenStreetMap contributors
09Milestones

From the competition to completion.

2023

Architectural Competition

2027

Building Permit Application and Start of Construction (planned)

2029

Completion (expected)

10-rollMKE
Affordable housing for workers in high-demand occupations and seniors: MKE as investor, builder, and project developer.
MKE Munich Investment GmbH · We create valueQuestions about the project? info@munichig.de
Menu